ALL PROJECTS

  • Cherryland Fire Station 23 Replacement

    The Project involves construction of a new 12,000 square foot two-story fire station for the Alameda County Fire Department. The new fire station would replace the existing seismically unsafe and outmoded Station 23 located approximately one block south of the Project site. The new fire station would house a single engine company with a core […]

  • 1769 11th Avenue San Francisco

    Brand new sweeping house in an exquisite location. Cool and contemporary finishes with decks. This is a jewel near the trendy Inner Sunset.

  • 1762 12th Avenue San Francisco

    Brand new sweeping house in an exquisite location. Cool and contemporary finishes with decks. This is a jewel near the trendy Inner Sunset.

  • 1758 12th Avenue San Francisco

    Brand new sweeping view house in an exquisite cul-de-sac location. Cool and contemporary finishes with decks at every level plus a flat yard and expansive open floor plan. 4 bedrooms, 3.5 baths, along with a media room, and an open plan family room / kitchen. This is the best of modern living near the trendy Inner Sunset.

  • PINOLE VALLEY HIGH SCHOOL INTERIM CAMPUS

    Installation of portable classroom buildings, connection of portables to new and existing utilities,site improvements and installation of site furnishings.

    The work included:

    Fire lane and ramp transition landings at grade; demolition/excavation as required to construct new paving; sewer domestic water, electrical & fire alarm connection to portables; installation of low voltage conduits (limited WAN/LAN conduits), security cameras, intrusion alarms, Comcast and AT&T, as required for a complete installation; installation of perimeter chain link fencing (fencing includes both footing and post driven chain link fence and gates); furnishing and installation of electrical connection including conduit and overhead cabling/ wiring to service side of distribution panel; coordination with conformed survey of site for the building pads, portable stub outs, benchmarks and building corners; furnishing and installation of temporary fencing as required during construction; furnishing of lock cylinder and transitional housing keying to match WCCUSD Standard; installation and coordination with District to provide paper towel dispenser and soap dispenser; installation of shade structures; installation of concrete retaining walls and walkways.

  • REPLACEMENT DRINKING FOUNTAINS AT FOUR CAMPUSES

    Complete renovation of all drinking fountains at four college campuses.

  • HAVENSCOURT MIDDLE SCHOOL CAMPUS HEALTH CENTER

    General modernization and Structural Improvements

  • FRICK MIDDLE SCHOOL WELLNESS CENTER

    Remodel of new health center.

  • SHERIFF’S CONTROL CENTER

    Remodeling and new addition to the Sheriff’s office.

  • TENNIS COURT BLEACHERS AT COLLEGE OF ALAMEDA

    New Bleachers, Structural and Site Improvements