CHADBOURNE ELEMENTARY SCHOOL
General modernization and alteration, Roofing and ADA Improvements.
-
3645 23rd STREET SAN FRANCISCO CONDOMINIUM
-
2612 POST STREET SAN FRANCISCO CONDOMINIUM
-
2610 POST STREET SAN FRANCISCO CONDOMINIUM
-
2608 POST STREET SAN FRANCISCO CONDOMINIUM
-
430 NORIEGA PRIVATE RESIDENCE IN SAN FRANCISCO
-
SARAH B COOPER MODERNIZATION PROJECT
General School Modernization and reconstruction including ADA Access and Fire/Life-Safety
upgrades, including but not limited to interior and exterior painting, miscellaneous site work,
flooring, door and frame replacement, plumbing, electrical, low voltage, window coverings,
hazardous material/Asbestos remediation and other miscellaneous interior renovation work. -
NEW BID PROJECT
New Project for Bid.
-
STONEHURST CHILD DEVELOPMENT CENTER
Stonehurst provides a model early education program for preschool and an after-school program for children in kindergarten through third grade. The program is designed to meet the educational/social/emotional/physical needs of each child, as well as early literacy/mathematics and mastery of kindergarten standards.
Juv Inc. was responsible for the removal of the existing Stonehurst CDC and construction of a new facility, including a new building with three classrooms, administration, outdoor play space and parking. Work included hazardous material abatement, concrete, structural steel, carpentry, casework, fiber cement siding, roofing, insulation, doors, windows, ceramic tile, acoustical ceiling, epoxy terrazzo flooring, sheet fl00ring, paint, signage, toilet accessories and fixtures, plumbing, fire sprinkler, heating and ventilation systems, energy management system, lighting, intercom, fire alarm, intrusion alarm, AC paving, chain link fence and gates, ornamental fence, irrigation, landscaping, and site utilities.
-
IDA B WELLS HIGH SCHOOL MODERNIZATION
General School Modernization and reconstruction including hazardous material/asbestos
remediation, building demolition, ADA Access and Fire/Life/Structural Safety upgrades,
including but not limited to shotcrete work, shear wall installation, masonry repair work, framing
and drywall installation, installation of fire sprinkler and fire alarm systems, clock & P.A. system,
bathroom remodeling, exterior repair work, miscellaneous site work, interior and exterior
painting, and other misc. renovation work.